Odor Control Features Make Lagoons an Acceptable Sludge Process
Studies and full-scale test operations at Sacramento’s new Regional Treatment Plant site show that large-scale facultative sludge lagoons can be…
Studies and full-scale test operations at Sacramento’s new Regional Treatment Plant site show that large-scale facultative sludge lagoons can be…
Does an auditor actually have the final word in determining grant eligibility? Can the grantee do anything about it? Is…
This paper describes the methodology employed in meeting the requirements of the regulatory agencies and the General Electric Company and…
This paper (1) will indicate why, under existing civil law, generators of hazardous wastes are relatively immune from liability for…
Initial development of the trickling filter/solids contact (TF/SC) process occurred at Corvallis, Oregon, in 1979 as a joint effort on…
This paper summarizes the requirements of a POTW pretreatment program and the key issues that should be addressed during program…
Selecting among cleanup and control options requires a thorough assessment of surface and subsurface contamination at the site.
Describes the ground-water monitoring system requirements involved in site-selection for a high-level nuclear waste disposal facility. Also considers regulatory, technical…
Prior to the adoption of the uniform national treatment standards by the U.S. Environmental Protection Agency (EPA) on August 17,…
States and countries must have engineering support to obtain the correct environment for people and industry. Puerto Rico has adopted…
This paper will describe several simple, appropriate technologies for biomass waste conversion which can be applied in rural or small…
Despite extensive study (much of it of a theoretical nature) of the use of pricing techniques to moderate water consumption…