Pre-award collaboration set a strong foundation for one of Denver Water’s first design-build projects. To overcome critical project challenges and pave the way for a successful procurement and delivery experience, Denver Water organized confidential, proprietary meetings ahead of the project award. This enabled Denver Water and their prospective design-builders to tune the project in a way that equitably balanced risks between the parties most able to manage them.
Awards
-
2018
DBIA Rocky Mountain Region, Best Overall Project
Related Projects
Restoration with the future in mind
Building resilience through adaptive strategies
A history of delivering innovative and forward-thinking solutions
Establishing a vision to meet future water challenges
Colorado Water Treatment Plant Optimization Study
Big Creek Water Reclamation Facility
James R. DiIorio Water Reclamation Facility Ntensify™ Nutrient Removal
Southwestern Parkway Combined Sewer Overflow Basin
City of Memphis Industrial Discharge Smart Sensor Monitoring
Integrated Utility Data Interface for Water Quality Optimization
Pure Water San Diego
Southeast Plant Biosolids Digester Facilities
Greenfield Water Reclamation Plant Expansion
Kaneohe-Kailua Regional Wastewater Treatment Plant, Facilities Plan, Tunnel Influent Pump Station (TIPS)
Lake Oswego Interceptor Sewer
Process Water Reclamation Facility
New Class A Biosolids and Energy Facility at Blue Plains Advanced Wastewater Treatment Plant
40-Year Wet-Weather Management Plan
Bull Run Water Filtration Plant
MS4 Compliance in the Chesapeake Bay
Mine, Landfill, and Manufacturing Site Remediation Planning
Metals-Impacted Soil Remediation
Littleton/Englewood Wastewater Treatment Plant
Large Diameter Pipeline Design
Landfill Treatment Upgrade Feasibility Study
Landfill Expansion and Containment
Lake Townsend Raw Water Intake and Pumping Station
Lake Erie Water Intake and Pumping Station Process Optimization
Water Treatment Plant Expansion
Water Supply Study
Wastewater Plant Tertiary Treatment and Transmission Pipeline
Val Vista Water Main Rehabilitation
Ultrafiltration Technology Pilot Study
Trickling Filter/Solids Contact System Design and Implementation
Stormwater Infrastructure Improvements
Stormwater Control and Management
Stibnite Gold Mine Environmental Impact Statement and Historic Mining District Restoration
Shipyard Remediation and Redevelopment
RM Clayton Water Reclamation Center Headworks
Remediation at a Steel and Gas Manufacturing and Storage Site
Remediation at a Former Manufacturing Facility
Remedial Process Optimization
Regulatory Support and Environmental Compliance
Pure Water San Diego Potable Reuse Program
Program Management
Pressurized MIEX System Design
Pipeline Construction, Environmental Compliance, and Permitting
Ozone Water Treatment Plant Expansion
Ordot Landfill Closure
Oakley Station Separation Sewer Project
Nutrient TMDL Planning and Regulatory Compliance
North 27th Street Inline Storage System
Johns Creek Environmental Campus
Integrated Wet Weather Planning
Integrated Wet Weather Management
Infrastructure Replacement and Rehabilitation Planning
Infrastructure Renewal and Replacement Program
Industrial Spill Prevention, Control, and Countermeasures Plans
Industrial Reuse and Aquifer Replenishment Project
Indian Head Wastewater Treatment Plant Upgrades
Groundwater Flow and Transport Modeling
Greenfield Pre-Treatment Plant
Former Manufacturing Facility Site Remediation
Former Power Plant Remediation
Former Manufacturing Site Remediation
Force Main Inspection and Condition Assessment
Former Nuodex Site Remediation and Restoration
Express and Ground Operations Environmental Support
Environmental Restoration Program Optimization
Dixie Drain Phosphorus Removal Facility
Discharge Treatment Analysis
Development, Maintenance, and Audits of Environmental and Safety Management Systems
Denver Regional Transportation District’s Elati Light Rail Station
Groundwater Remedial Action Construction
Turnkey Excavation and Dewatering Design-Build
Coosa River Basin Nutrient Trading Framework
Comprehensive Manufacturing Environmental Health and Safety Program
Compliance and Permitting Program Management and Implementation
Compliance and Permitting Assessment
Companywide Environmental Health and Safety Program
Cogeneration System Upgrade
Coastal Master Plan
Climate Change Adaptation Planning
Chambers Creek Regional Wastewater Treatment Plant Expansion
Camp Pendleton Infrastructure Expansion
Biosolids Flow-Through Thermophilic Treatment Design and Implementation
Biological Nutrient Removal Pilot Facility
Annacis Island and Lulu Island Wastewater Treatment Plants
American Cyanamid Superfund Site Remediation
Aggregate Mining Facility Remediation
Biosolids Management Program Upgrade
Related News
- Santa Monica takes landmark step toward water self-sufficiency
- Brown and Caldwell’s Rod Pope elected DBIA Fellow
- Principles of O&M engagement for design-build projects
- Hidden Beauty of The Water Cycle: An Interview with Photographer Brad Temkin
- The Coming Revolution in Water Stewardship
- The Coming Revolution in Water Stewardship
- Q&A with Prabhakar Somavarapu of Regional San and SASD
- Brown and Caldwell to lead large-scale improvements at Boulder, Colorado, drinking water treatment facility
- WDBC Collaborative-Delivery Education Series Round 2
- DBIA-Western Pacific Region Webinar